Deploying suction pump on barge at Phu Huu port

may hut bom tren bong tong

Tay Do Saigon is very pleased to have put into operation an additional suction pump on barge at Phu Huu port – District 9 – Ho Chi Minh City.

This is a system with a capacity of 100 tons/hour, mounted on barges. Cement and fly ash are sucked and discharged into the tank truck, the discharge length is 20-30m. The screw feeder sucks cement and fly ash from barges and ships with a capacity of 1500-3000 tons.

Contact for quotation and consultation: 0909 774 600

Email: dothanhtay@gmail.com

Facebook

Buy and sell cement pump, fly ash, suction pump on barge

Leave a Reply

Your email address will not be published. Required fields are marked *